Infrastructure projects

Infrastructure development projects of Odesa sea port
 
1. The development of territory at shipyard "Ukraine"
 
Specifications:
  •  Specialization - Container, vegetable oils, etc. (based on transportation market conditions) or other.
  • Project capacity - 650 thousand TEU (further development up to the 2 000 thousand tons per year of vegetable oils).
  • Length of the berth - 350 meters.
  • Depth at the berth - 15 meters.
  • Open storage area - 94.2 thousand square meters, of which 35 thousand created artificially.
  • The cost of the project - 1 200 million UAH.*
  • Form of realization - Public Private Partnership or other.
2. Development of transshipment facilities in the territory of the Oil Harbor
 
Specifications:
  • Specialization - oil cargoes.
  • Project capacity - 24 200 thousand tons per year (including capacity increase of 200 thousand tons per year).
  • The length of berths - 93/259/131/82/151/45 meter.
  • Depth at the berths - 14 meters.
  • The cost of the project – 200 million UAH.*
  • Form of realization - Public Private Partnership or other.
3. Development of passenger terminal

Specifications:

  • Specialization - servicing passenger vessels, shopping and entertainment activities, other.
  • Project capacity - up to 1 million passengers.
  • The length of berths - 1370 meter.
  • Depth at the berths - 11,5 meters.
  • The cost of the project- 120 million UAH.*
  • Floor area - 3,47 thousand sq. meters (of which 2.4 thousand sq. meters - concert and exhibition hall and 1.07 thousand sq. meters - Marine art terminal)
  • Form of realization - Public Private Partnership or other.

*Shown prices correspond to the time of preparation of project proposals

 
Infrastructure development projects of Mykolaiv sea port
 
1. Universal handling complex on the projected number berth №8

Specifications:

  • Specialization - universal or other;
  • Project capacity - 1 million tons per year;
  • Berth length - 190 m;
  • Support berth length - 71.5 m;
  • Depth at berth - 10.5 m (calculated the possibility to increase depth up to 11.5 m);
  • Allowable checkpoint draft vessels - 10 m;
  • Open storage area - 10 thousand sq. m.;
  • Construction costs - 169 million UAH*, including the construction of hydraulic structures - 99 million UAH and Terminal (warehouse) part - 70 million UAH;
  • Form of realization - public-private partnership or other.
2. Transshipment complex at berth number 14A
  • Specialization - universal or other;
  • Project capacity - 1 million tons per year;
  • Berth length - 240 m;
  • Depth at berth - 10.5 m (calculated the possibility to increase depth up to 11.5 m);
  • Allowable checkpoint draft vessels - 10 m;
  • Area of adjacent territory - 30 thousand sq. m.;
  • Form of realization - public-private partnership or other.
 3. Transshipment complex at berth number 16
  • Specialization - universal or other;
  • Project capacity - 1 million tons per year;
  • Berth length – 320 m;
  • Depth at berth - 10.5 m (calculated the possibility to increase depth up to 11.5 m);
  • Allowable checkpoint draft vessels - 10 m;
  • Area of adjacent territory - 37 thousand sq. m.;
  • Form of realization - public-private partnership or other.
 4. Transshipment complex at berth number 17
  • Specialization - universal or other;
  • Project capacity - 1 million tons per year;
  • Berth length – 250 m;
  • Depth at berth - 10.5 m (calculated the possibility to increase depth up to 11.5 m);
  • Allowable checkpoint draft vessels - 10 m;
  • Area of adjacent territory – 30 thousand sq. m.;
  • Form of realization - public-private partnership or other.

 *Shown prices correspond to the time of preparation of project proposals

 
 
 
Infrastructure development projects of Berdiansk sea port
 
1.Construction of cargo complex at berths number 9, 10.

Specifications:

  • Specialization – transshipment of iron and steel products or other.
  • Project capacity - 260 thousand tons per year.
  • Length of the berth №10 - 230 meters (additional reconstruction of berth number 9 with length of 100 meters).
  • Depth at the berths - 9 meters.
  • Open storage area - 15 thousand sq. meters (additional 2.3 thousand sq. m. meters after reconstruction of berth number 9).
  • The cost of the project - 126.6 million UAH*.
  • Form of realization - Public Private Partnership or other.
  2. Construction of of specialized cargo complex at berth number 11
  • Specialization - coal and coke or other.
  • Project capacity - 600 thousand tons per year.
  • Length of the berth - up to 209 meters.
  • Depth at the berth - 9 meters.
  • Open storage area - 24 thousand sq. meters.
  • The cost of the project - 300 million UAH*.
  • Form of realization - Public Private Partnership or other.

  *Shown prices correspond to the time of preparation of project proposals

 
Infrastructure development projects of Bilgorod-Dniestrovsky sea port
 
1. Construction of cargo complex at modernized berths number 1 and number 2 berth designed (Bugaz)

Specifications:

  • Specialization - grains.
  • Project capacity - 260 thousand tons per year.
  • Length of the berth - 360 meters.
  • Depth at the berth - 5 meters.
  • The cost of the project - 245 million UAH.
  • Form of realization - Public Private Partnership.
 2. Construction of cargo complex at projected berths number 10, 11
  • Specialization - grains.
  • Project capacity - 200 thousand tons per year.
  • Length of the berth - 300 meters (determined at the designing stage).
  • Depth of the berth - 4.5-5 meters.
  • The cost of the project - 55 million UAH.
  • Form of realization - Public Private Partnership.
  3. Construction of a second cargo area at projected berths number 12 and 13
  • Specialization - universal (determined by the investor)
  • Project capacity - 250 thousand tons per year
  • Length of the berth - 300 meters (determined at the designing stage)
  • Depth at the berth - 4.5-5 meters
  • The cost of the project - 120 million UAH.
  • Form of realization - Public Private Partnership.

 

Infrastructure development projects of Kherson sea port
 
1. Construction of mechanical complex in the back of the berth number 3
 
Specifications:
  • Specialization - mineral fertilizers or other.
  • Project capacity - 300 thousand tons per year.
  • Length of the berth - 150 meters.
  • Depth at the berth - 7.5 meters.
  • The cost of the project - 70 million UAH.*
  • Form of realization - Public Private Partnership or other.
2. Construction of a container terminal in the deluge № 2
  • Specialization – Container cargo or other.
  • Project capacity - 22 thousand TEU per year.
  • Length of the berth - 145.5 meters.
  • Depth at the berth - 7.6 meters.
  • The cost of the project - 137 million UAH.*
  • Open storage area - 2,5 thousand square meters.
  • Form of realization - Public Private Partnership or other.
3. Construction of transshipment complex in the deluge № 2
  • Specialization - forest in bulk cargo or other.
  • Project capacity - 170 thousand tons per year.
  • Length of the berth - 130 meters.
  • Depth at the berth - 7.6 meters.
  • The cost of the project - 43 million UAH.*
  • Open storage area - 1,5 thousand square meters.
  • Form of realization - Public Private Partnership or other.
4. Construction of transshipment complex in the deluge № 2
  • Specialization - coal and coke or other.
  • Project capacity - 400 thousand tons per year.
  • Length of the berth - 150 meters
  • Depth at the berth - 8.2 meters
  • The cost of the project - 48 million UAH.*
  • Open storage area - 3 thousand square meters.
  • Form of realization – Public Private Partnership or other.
*Shown prices correspond to the time of preparation of project proposals

 
Infrastructure development projects of Ilychivsk sea port
 
1. The development of storage areas and facilities in the back berths № 7, 8, 9, 10

Specifications:

  • Specialization - general and bulk cargoes or other.
  • Project capacity - 1.9 million tons per year.
  • Length of the berth - 820 meters (220/178/199/223).
  • Depth at the berth - 15 meters.
  • Form of realization - Public Private Partnership or other.
 2. Development of the fourth terminal in the back of berths № 21 and 22, reconstruction of adjacent rear territories (including "unequipped coast")
  • Specialization - general and bulk cargoes or other.
  • Project capacity - 9.4 million tons per year.
  • Length of the berth - 500 meters.
  • Depth at the berth - 15 meters.
  • The cost of the project - 136.9 million UAH.*
  • Open storage area - 310 sq. meters.
  • Form of realization - Public Private Partnership or other.

*Shown prices correspond to the time of preparation of project proposals

 

Infrastructure development projects of Mariupol sea port
 
1.Construction of the Northern Port area with the creation of berths number 41, 42, 43, 44

Specifications:

  • Specialization - coal, grain, petroleum products or other.
  • Project capacity - 6 million tons per year.
  • Length of the berths - 815 meters, of which:
  • Berth number 41 - 220 meters;
  • Berth number 42 - 210 meters;
  • Berth number 43 - 210 meters;
  • Berth number 44 - 175 meters;
  • Depth at the berth - 9,75 meters.
  • Open storage area - 760 thousand sq. meters.
  • Form of realization - Public Private Partnership or other.
 2. Construction of transshipment complex at the berth number 2
  • Specialization - vegetable oil or other.
  • Project capacity up to 1 million tons per year.
  • Length of the berth -150 meters.
  • Depth at the berth - 8.5 meters.
  • Reservoir park with total capacity - 26 thousand cubic meters.
  • Form of realization - Public Private Partnership or other.
 3. Construction of transshipment complex at the berths number 16 and 17
  • Specialization – Containers or other.
  • Project capacity - 100 thousand TEU per year.
  • Length of the berths - 200/200 meters.
  • Depth at the berths - 9,75 meters.
  • Open storage area - 13,7 thousand square meters.
  • Form of realization - Public Private Partnership or other.
 
Infrastructure development projects of Yuzhny sea port
1. Construction of cargo complex on projected berths in the port water area

Specifications:

  • Specialization - handling of liquefied natural gas.
  • Project capacity - 10 bln. cubic meters per year.
  • Length of the berth - 386 meters.
  • Projected depth at the berth - 15 meters.
  • Storage area - 3 LNG storage tanks with a total capacity of 540 thousand cubic meters.
  • Form of realization - Public Private Partnership or other. 

 

 

Infrastructure development projects of Izmail sea port
 
1. Transshipment complex at berth number 26

Specifications:

  • Specialization - bulk fertilizers or other.
  • Project capacity - 400 thousand tons per year.
  • Length of the berth - 101 meters.
  • Depth at the berth – 5,6 meters.
  • The cost of the project - 75 million UAH.*
  • Form of realization- Public Private Partnership or other.
 2. Construction of cargo complex on projected berths number 27 and 28
  •  Specialization - bulk cargoes or other.
  • Project capacity - 2 200 thousand tons per year.
  • Length of the berth - 280 meters (140 meters each).
  • The length of the auxiliary berth - 100 meters.
  • Depth at the berth - 6.5 meters.
  • Open storage area - 28.4 thousand square meters.
  • The cost of the project - 126 million UAH.*
  • Form of realization- Public Private Partnership or other.

 *Shown prices correspond to the time of preparation of project proposals 

 

 Infrastructure development projects of Oktyabrsk sea port
 1. Construction of the grain complex designed by the dock at number 0

Specifications:

  • Specialization - Grain cargo or other.
  • Project capacity - 3 200 thousand tons per year.
  • The length of the projected berth - 270 meters.
  • The project depth at the berth - 13,0 meters.
  • The nominal capacity of warehouses - 244.5 thousand tons, of which 168.5 thousand tons of silo storage.
  • The cost of construction – 1 175 million UAH*.
  • Form of realization - Public Private Partnership or other.
 2. Construction of cargo complex in the rear of the auxiliary berth

Specifications:

  • Specialization - grain cargo or other.
  • Project capacity - 2 200 thousand tons per year.
  • Length of the berth - 250 meters.
  • Depth at the berth - 9,75 meters.
  •  Nominal capacity silo storage warehouses - 100 thousand tons.
  • The cost of construction - 250 million UAH*.
  • Form of realization - Public Private Partnership or other.
 3. Construction of cargo complex at the projected berth number 7

Specifications:

  • Specialization - general cargo or other.
  • Project capacity - 600 thousand tons per year.
  • Length of the berth - 250 meters.
  • Projected depth at the berth - 13 meters.
  • Open storage area - 180 sq. meters.
  • The cost of construction - 207 million UAH*.
  • Form of realization - Public Private Partnership or other.

 *Shown prices correspond to the time of preparation of project proposals